PaintDays

When to paint a house exterior in San Angelo, TX

When to paint in San Angelo, TX

A short season: book early and expect weather delays. The painting window is March to May, and even that is thin, with 0 good months a year. The best month is October, at about 10 painting days. Book a painter by January.

If you want the house done in March to May, call for quotes in January or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Sep, Oct, Nov.

  1. 1Jan
  2. 3Feb
  3. 8Mar
  4. 8Apr
  5. 7May
  6. 2Jun
  7. under 1Jul
  8. under 1Aug
  9. 5Sep
  10. 10Oct
  11. 6Nov
  12. 3Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January111033° / 65°F
February321236° / 69°F
March882045° / 78°F
April841552° / 85°F
May75962° / 91°F
June21269° / 98°F
Julyunder 1under 1under 172° / 100°F
Augustunder 1under 1under 172° / 100°F
September54665° / 93°F
October1081753° / 85°F
November661643° / 73°F
December331236° / 68°F

Deck stain does best in March. Low-temperature paint adds about 65 days a year here.

Towns near San Angelo compared

6 of the 6 nearest places get more painting days, the most in Brownwood (105 a year, 89 miles east). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom San AngeloPainting days a yearWindowStation
Sweetwater, TX71 mi north81OctoberAvenger Field Airport
Abilene, TX82 mi northeast63March to MayAbilene Regional Airport
Big Spring, TX82 mi northwest69OctoberBig Srng Mcmhn-Wrkle Airport
Brownwood, TX89 mi east105April to MayBrownwood Regional Airport
Snyder, TX92 mi north79OctoberWinston Field Airport
Midland, TX106 mi northwest70AprilMidland Airpark

How San Angelo ranks in TX

Of 252 TX places with 10,000 people or more, San Angelo (population 100,159, 44th largest) ranks 244th for painting days, 36 days below the state median of 89. The longest season in the state is Pasadena, 177 days, 339 miles east. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 65 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from San Angelo Regional/Maths Fie (6.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.