PaintDays

When to paint a house exterior in Brownwood, TX

When to paint in Brownwood, TX

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is May, at about 19 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Sep, Oct, Nov, Dec.

  1. 2Jan
  2. 3Feb
  3. 12Mar
  4. 15Apr
  5. 19May
  6. 12Jun
  7. 2Jul
  8. 2Aug
  9. 11Sep
  10. 16Oct
  11. 7Nov
  12. 4Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221133° / 61°F
February321437° / 65°F
March12122447° / 73°F
April15152552° / 79°F
May19162162° / 85°F
June1271269° / 93°F
July21273° / 97°F
August21273° / 98°F
September11101265° / 90°F
October16152354° / 80°F
November771943° / 70°F
December441437° / 64°F

Deck stain does best in May. Low-temperature paint adds about 75 days a year here.

Towns near Brownwood compared

6 get fewer, down to 63 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom BrownwoodPainting days a yearWindowStation
Stephenville, TX56 mi northeast88April to MayClark Field Municipal Airport
Abilene, TX68 mi northwest63March to MayAbilene Regional Airport
Copperas Cove, TX75 mi southeast92April to MayRobert Gray Aff Airport
Gatesville, TX75 mi east95March to MayGatesville Municipal Airport
Killeen, TX86 mi southeast88April to MayKilleen Municipal Airport
Granbury, TX86 mi northeast78AprilGranbury Municipal Airport

How Brownwood ranks in TX

Of 252 TX places with 10,000 people or more, Brownwood (population 18,772, 163rd largest) ranks 44th for painting days, 16 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 268 miles southeast. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 75 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Brownwood Regional Airport (6.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.