PaintDays

When to paint a house exterior in Gatesville, TX

When to paint in Gatesville, TX

A normal season: plan the job, do not leave it late. The painting window is March to May, with 4 good months a year. The best month is October, at about 16 painting days. Book a painter by January.

If you want the house done in March to May, call for quotes in January or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Sep, Oct, Nov, Dec.

  1. 2Jan
  2. 5Feb
  3. 13Mar
  4. 15Apr
  5. 14May
  6. 4Jun
  7. 2Jul
  8. 1Aug
  9. 8Sep
  10. 16Oct
  11. 9Nov
  12. 6Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221237° / 61°F
February551340° / 64°F
March13122250° / 73°F
April15122156° / 79°F
May14101465° / 86°F
June43472° / 94°F
July21275° / 97°F
August11175° / 98°F
September88869° / 91°F
October16152057° / 81°F
November991947° / 70°F
December661642° / 65°F

Deck stain does best in October. Low-temperature paint adds about 57 days a year here.

Towns near Gatesville compared

6 get fewer, down to 77 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom GatesvillePainting days a yearWindowStation
Copperas Cove, TX24 mi southwest92April to MayRobert Gray Aff Airport
Killeen, TX25 mi south88April to MayKilleen Municipal Airport
Harker Heights, TX27 mi south88April to MayKilleen Municipal Airport
Belton, TX31 mi southeast77April to MayDraughon-Miller Cntrl Tx Rgnl
Temple, TX31 mi southeast77April to MayDraughon-Miller Cntrl Tx Rgnl
Hewitt, TX33 mi east77AprilMc Gregor Executive Airport

How Gatesville ranks in TX

Of 252 TX places with 10,000 people or more, Gatesville (population 16,388, 183rd largest) ranks 76th for painting days, 6 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 198 miles southeast. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 57 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Gatesville Municipal Airport (3.5 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.