PaintDays

When to paint a house exterior in Big Spring, TX

When to paint in Big Spring, TX

A short season: book early and expect weather delays. The painting window is October, with 1 good month a year. The best month is October, at about 13 painting days. Book a painter by August.

If you want the house done in October, call for quotes in August or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Sep, Oct, Nov.

  1. under 1Jan
  2. 2Feb
  3. 8Mar
  4. 12Apr
  5. 10May
  6. 3Jun
  7. 2Jul
  8. 2Aug
  9. 10Sep
  10. 13Oct
  11. 6Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1832° / 59°F
February211436° / 67°F
March872245° / 74°F
April1282052° / 81°F
May1071161° / 89°F
June3under 1370° / 95°F
July22273° / 97°F
August2under 1272° / 96°F
September1081065° / 89°F
October13131954° / 81°F
November661843° / 68°F
December111235° / 62°F

Deck stain does best in October. Low-temperature paint adds about 71 days a year here.

Towns near Big Spring compared

3 of the 6 nearest places get more painting days, the most in Sweetwater (81 a year, 65 miles east); 2 get fewer, down to 53 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom Big SpringPainting days a yearWindowStation
Midland, TX40 mi west70AprilMidland Airpark
Snyder, TX47 mi northeast79OctoberWinston Field Airport
Odessa, TX56 mi southwest80AprilOdessa-Schlemeyer Field Airport
Andrews, TX63 mi west59April to MayGaines County Airport
Sweetwater, TX65 mi east81OctoberAvenger Field Airport
San Angelo, TX82 mi southeast53March to MaySan Angelo Regional/Maths Fie

How Big Spring ranks in TX

Of 252 TX places with 10,000 people or more, Big Spring (population 22,541, 143rd largest) ranks 229th for painting days, 20 days below the state median of 89. The longest season in the state is Pasadena, 177 days, 416 miles southeast. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 71 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Big Srng Mcmhn-Wrkle Airport (2.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.