PaintDays

When to paint a house exterior in Lebanon, PA

When to paint in Lebanon, PA

A short season: book early and expect weather delays. The painting window is August, with 1 good month a year. The best month is August, at about 14 painting days. Book a painter by June.

If you want the house done in August, call for quotes in June or earlier; a job pushed past August is likely to wait until next year. For a deck, the months with enough staining days to spare are Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 6May
  6. 10Jun
  7. 11Jul
  8. 14Aug
  9. 10Sep
  10. 3Oct
  11. under 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1223° / 40°F
Februaryunder 1under 1124° / 45°F
Marchunder 1under 1431° / 54°F
April221140° / 66°F
May641350° / 76°F
June1051457° / 83°F
July1171164° / 88°F
August14101462° / 86°F
September1071655° / 79°F
October321344° / 69°F
Novemberunder 1under 1733° / 56°F
Decemberunder 1under 1228° / 46°F

Deck stain does best in August. Low-temperature paint adds about 50 days a year here.

Towns near Lebanon compared

6 of the 6 nearest places get more painting days, the most in Elizabethtown (66 a year, 16 miles southwest). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom LebanonPainting days a yearWindowStation
Elizabethtown, PA16 mi southwest66August to SeptemberHarrisburg International Airport
Ephrata, PA17 mi southeast63August to SeptemberLancaster Airport
Columbia, PA22 mi south63August to SeptemberLancaster Airport
Lancaster, PA22 mi south63August to SeptemberLancaster Airport
Wyomissing, PA24 mi east63August to SeptemberRdng Rgnl/C A Spaatz Fd Airport
Harrisburg, PA25 mi west63SeptemberCapital City Airport

How Lebanon ranks in PA

Of 68 PA places with 10,000 people or more, Lebanon (population 26,456, 21st largest) ranks 65th for painting days, 8 days below the state median of 65. The longest season in the state is Indiana, 109 days, 145 miles west. The shortest is St. Marys at 39. Switching to low-temperature paint here is worth 50 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Muir Army Airfield (Fort Indi (9.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.