PaintDays

When to paint a house exterior in Harrisburg, PA

When to paint in Harrisburg, PA

A short season: book early and expect weather delays. The painting window is September, with 1 good month a year. The best month is September, at about 13 painting days. Book a painter by July.

If you want the house done in September, call for quotes in July or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. 1Mar
  4. 3Apr
  5. 9May
  6. 12Jun
  7. 8Jul
  8. 12Aug
  9. 13Sep
  10. 6Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1225° / 43°F
Februaryunder 1under 1226° / 48°F
March1under 1633° / 57°F
April321243° / 68°F
May951553° / 78°F
June1271261° / 86°F
July84868° / 91°F
August1281266° / 89°F
September13101659° / 82°F
October661948° / 71°F
November11936° / 59°F
Decemberunder 1under 1230° / 49°F

Deck stain does best in September. Low-temperature paint adds about 52 days a year here.

Towns near Harrisburg compared

1 of the 6 nearest places get more painting days, the most in Elizabethtown (66 a year, 17 miles southeast); 1 gets fewer, down to 57 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Mechanicsburg, Carlisle are read from the same station as Harrisburg, so their numbers match; the real difference is the distance from that station.

PlaceFrom HarrisburgPainting days a yearWindowStation
Mechanicsburg, PA8 mi southwest63Septembersame station
Elizabethtown, PA17 mi southeast66August to SeptemberHarrisburg International Airport
Carlisle, PA18 mi west63Septembersame station
York, PA23 mi south63July to AugustYork Airport
Lebanon, PA25 mi east57AugustMuir Army Airfield (Fort Indi
Columbia, PA26 mi southeast63August to SeptemberLancaster Airport

How Harrisburg ranks in PA

Of 68 PA places with 10,000 people or more, Harrisburg (population 50,649, 9th largest) ranks 51st for painting days, 2 days below the state median of 65. The longest season in the state is Indiana, 109 days, 122 miles west. The shortest is St. Marys at 39. Switching to low-temperature paint here is worth 52 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Capital City Airport (4.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.