PaintDays

When to paint a house exterior in Elizabethtown, PA

When to paint in Elizabethtown, PA

A normal season: plan the job, do not leave it late. The painting window is August to September, with 3 good months a year. The best month is September, at about 14 painting days. Book a painter by June.

If you want the house done in August to September, call for quotes in June or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 9May
  6. 13Jun
  7. 10Jul
  8. 13Aug
  9. 14Sep
  10. 5Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1124° / 42°F
Februaryunder 1under 1125° / 47°F
Marchunder 1under 1532° / 56°F
April221342° / 67°F
May961553° / 77°F
June13101362° / 85°F
July1051069° / 90°F
August1381367° / 87°F
September14101560° / 81°F
October551848° / 70°F
November1under 1835° / 58°F
Decemberunder 1under 1129° / 47°F

Deck stain does best in June. Low-temperature paint adds about 48 days a year here.

Towns near Elizabethtown compared

4 get fewer, down to 57 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom ElizabethtownPainting days a yearWindowStation
Columbia, PA10 mi southeast63August to SeptemberLancaster Airport
York, PA15 mi southwest63July to AugustYork Airport
Lebanon, PA16 mi northeast57AugustMuir Army Airfield (Fort Indi
Harrisburg, PA17 mi northwest63SeptemberCapital City Airport
Lancaster, PA18 mi southeast63August to SeptemberLancaster Airport
Mechanicsburg, PA22 mi west63SeptemberCapital City Airport

How Elizabethtown ranks in PA

Of 68 PA places with 10,000 people or more, Elizabethtown (population 11,993, 56th largest) ranks 32nd for painting days, 1 day above the state median of 65. The longest season in the state is Indiana, 109 days, 138 miles west. The shortest is St. Marys at 39. Switching to low-temperature paint here is worth 48 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Harrisburg International Airport (9.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.