PaintDays

When to paint a house exterior in West Columbia, SC

When to paint in West Columbia, SC

A short season: book early and expect weather delays. The painting window is October, with 1 good month a year. The best month is October, at about 14 painting days. Book a painter by August.

If you want the house done in October, call for quotes in August or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Sep, Oct.

  1. 1Jan
  2. 3Feb
  3. 7Mar
  4. 10Apr
  5. 12May
  6. 5Jun
  7. 2Jul
  8. 3Aug
  9. 10Sep
  10. 14Oct
  11. 4Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11535° / 61°F
February33939° / 67°F
March761545° / 73°F
April10101951° / 80°F
May1291560° / 86°F
June55668° / 92°F
July21273° / 95°F
August32372° / 93°F
September10101066° / 89°F
October14142354° / 81°F
November441343° / 70°F
December11839° / 64°F

Deck stain does best in October. Low-temperature paint adds about 54 days a year here.

Towns near West Columbia compared

3 of the 6 nearest places get more painting days, the most in Cayce (77 a year, 4 miles southeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Lexington, Irmo are read from the same station as West Columbia, so their numbers match; the real difference is the distance from that station.

PlaceFrom West ColumbiaPainting days a yearWindowStation
Cayce, SC4 mi southeast77OctoberColumbia Owens Downtown Airport
Lexington, SC7 mi west71Octobersame station
Forest Acres, SC8 mi east77OctoberColumbia Owens Downtown Airport
Irmo, SC10 mi northwest71Octobersame station
Columbia, SC12 mi east77OctoberColumbia Owens Downtown Airport
Newberry, SC35 mi northwest73MayGreenwood County Airport

How West Columbia ranks in SC

Of 42 SC places with 10,000 people or more, West Columbia (population 18,418, 29th largest) ranks 38th for painting days, 11 days below the state median of 82. The longest season in the state is Myrtle Beach, 122 days, 128 miles east. The shortest is Tega Cay at 68. Switching to low-temperature paint here is worth 54 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Columbia Metropolitan Airport (3.5 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.