PaintDays

When to paint a house exterior in Columbia, SC

When to paint in Columbia, SC

A short season: book early and expect weather delays. The painting window is October, with 1 good month a year. The best month is October, at about 15 painting days. Book a painter by August.

If you want the house done in October, call for quotes in August or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Sep, Oct.

  1. 1Jan
  2. 4Feb
  3. 7Mar
  4. 11Apr
  5. 12May
  6. 6Jun
  7. 2Jul
  8. 4Aug
  9. 11Sep
  10. 15Oct
  11. 4Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11736° / 61°F
February441040° / 66°F
March761746° / 73°F
April1192052° / 80°F
May1291561° / 86°F
June66669° / 92°F
July21273° / 95°F
August43472° / 93°F
September11111167° / 89°F
October15152355° / 81°F
November441645° / 70°F
December11840° / 64°F

Deck stain does best in October. Low-temperature paint adds about 61 days a year here.

Towns near Columbia compared

3 get fewer, down to 71 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Forest Acres, Cayce are read from the same station as Columbia, so their numbers match; the real difference is the distance from that station.

PlaceFrom ColumbiaPainting days a yearWindowStation
Forest Acres, SC4 mi west77Octobersame station
Cayce, SC10 mi southwest77Octobersame station
West Columbia, SC12 mi west71OctoberColumbia Metropolitan Airport
Irmo, SC17 mi west71OctoberColumbia Metropolitan Airport
Lexington, SC18 mi west71OctoberColumbia Metropolitan Airport
Sumter, SC30 mi east77MayShaw Air Force Base

How Columbia ranks in SC

Of 42 SC places with 10,000 people or more, Columbia (population 144,788, 2nd largest) ranks 26th for painting days, 4 days below the state median of 82. The longest season in the state is Myrtle Beach, 122 days, 118 miles east. The shortest is Tega Cay at 68. Switching to low-temperature paint here is worth 61 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Columbia Owens Downtown Airport (7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.