PaintDays

When to paint a house exterior in Union City, GA

When to paint in Union City, GA

A normal season: plan the job, do not leave it late. The painting window is September to October, with 3 good months a year. The best month is May, at about 18 painting days. Book a painter by July.

If you want the house done in September to October, call for quotes in July or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Aug, Sep, Oct, Nov.

  1. 1Jan
  2. 2Feb
  3. 6Mar
  4. 11Apr
  5. 18May
  6. 11Jun
  7. 4Jul
  8. 7Aug
  9. 14Sep
  10. 16Oct
  11. 5Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January1under 1635° / 58°F
February21840° / 64°F
March661546° / 71°F
April1191952° / 77°F
May18151962° / 83°F
June1191169° / 89°F
July41472° / 92°F
August74772° / 91°F
September14131467° / 87°F
October16162356° / 78°F
November551845° / 68°F
December21940° / 61°F

Deck stain does best in October. Low-temperature paint adds about 57 days a year here.

Towns near Union City compared

1 gets fewer, down to 65 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. South Fulton, Fairburn, College Park, East Point, Riverdale are read from the same station as Union City, so their numbers match; the real difference is the distance from that station.

PlaceFrom Union CityPainting days a yearWindowStation
South Fulton, GA3 mi north95September to Octobersame station
Fairburn, GA3 mi southwest95September to Octobersame station
College Park, GA7 mi northeast95September to Octobersame station
East Point, GA7 mi northeast95September to Octobersame station
Riverdale, GA9 mi east95September to Octobersame station
Fayetteville, GA11 mi southeast65MayPchtre Cty-Falcon Field Airport

How Union City ranks in GA

Of 101 GA places with 10,000 people or more, Union City (population 28,195, 45th largest) ranks 27th for painting days, 14 days above the state median of 81. The longest season in the state is McDonough, 144 days, 26 miles southeast. The shortest is Cedartown at 56. Switching to low-temperature paint here is worth 57 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Hartsfield-Jackson Atlanta In (7.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.