PaintDays

When to paint a house exterior in College Park, GA

When to paint in College Park, GA

A normal season: plan the job, do not leave it late. The painting window is September to October, with 3 good months a year. The best month is May, at about 18 painting days. Book a painter by July.

If you want the house done in September to October, call for quotes in July or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Aug, Sep, Oct, Nov.

  1. 1Jan
  2. 2Feb
  3. 6Mar
  4. 11Apr
  5. 18May
  6. 11Jun
  7. 4Jul
  8. 7Aug
  9. 14Sep
  10. 16Oct
  11. 5Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January1under 1635° / 58°F
February21840° / 64°F
March661546° / 71°F
April1191952° / 77°F
May18151962° / 83°F
June1191169° / 89°F
July41472° / 92°F
August74772° / 91°F
September14131467° / 87°F
October16162356° / 78°F
November551845° / 68°F
December21940° / 61°F

Deck stain does best in October. Low-temperature paint adds about 57 days a year here.

Towns near College Park compared

1 gets fewer, down to 73 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. East Point, Riverdale, Forest Park, Union City, South Fulton are read from the same station as College Park, so their numbers match; the real difference is the distance from that station.

PlaceFrom College ParkPainting days a yearWindowStation
East Point, GA2 mi north95September to Octobersame station
Riverdale, GA6 mi southeast95September to Octobersame station
Forest Park, GA6 mi east95September to Octobersame station
Union City, GA7 mi southwest95September to Octobersame station
South Fulton, GA7 mi west95September to Octobersame station
Atlanta, GA9 mi north73MayFulton County-Brown Field Airport

How College Park ranks in GA

Of 101 GA places with 10,000 people or more, College Park (population 13,953, 86th largest) ranks 31st for painting days, 14 days above the state median of 81. The longest season in the state is McDonough, 144 days, 23 miles southeast. The shortest is Cedartown at 56. Switching to low-temperature paint here is worth 57 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Hartsfield-Jackson Atlanta In (1.5 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.