PaintDays

When to paint a house exterior in Terrell, TX

When to paint in Terrell, TX

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is May, at about 17 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Sep, Oct, Nov.

  1. 2Jan
  2. 5Feb
  3. 11Mar
  4. 14Apr
  5. 17May
  6. 5Jun
  7. 2Jul
  8. 2Aug
  9. 9Sep
  10. 15Oct
  11. 8Nov
  12. 4Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221137° / 59°F
February551341° / 62°F
March11101950° / 71°F
April14122055° / 77°F
May17151765° / 84°F
June53572° / 92°F
July21275° / 96°F
August21275° / 96°F
September99968° / 91°F
October15152057° / 81°F
November871847° / 69°F
December441342° / 63°F

Deck stain does best in October. Low-temperature paint adds about 56 days a year here.

Towns near Terrell compared

3 of the 6 nearest places get more painting days, the most in Forney (106 a year, 9 miles west). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom TerrellPainting days a yearWindowStation
Forney, TX9 mi west106April to MayMesquite Metropolitan Airport
Heath, TX13 mi northwest90April to MayRalph M Hall Rockwall Municip
Seagoville, TX15 mi west106April to MayMesquite Metropolitan Airport
Rockwall, TX16 mi northwest90April to MayRalph M Hall Rockwall Municip
Fate, TX16 mi north90April to MayRalph M Hall Rockwall Municip
Mesquite, TX17 mi west106April to MayMesquite Metropolitan Airport

How Terrell ranks in TX

Of 252 TX places with 10,000 people or more, Terrell (population 22,977, 140th largest) ranks 95th for painting days, 3 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 223 miles south. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 56 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Terrell Municipal Airport (2.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.