PaintDays

When to paint a house exterior in Rockwall, TX

When to paint in Rockwall, TX

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is May, at about 16 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Sep, Oct, Nov.

  1. 2Jan
  2. 4Feb
  3. 10Mar
  4. 14Apr
  5. 16May
  6. 5Jun
  7. 2Jul
  8. 1Aug
  9. 9Sep
  10. 16Oct
  11. 8Nov
  12. 4Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221238° / 58°F
February441241° / 61°F
March1081850° / 71°F
April14111955° / 76°F
May16111665° / 84°F
June53572° / 92°F
July21275° / 96°F
August11175° / 96°F
September99969° / 90°F
October16161958° / 80°F
November881848° / 68°F
December441544° / 63°F

Deck stain does best in October. Low-temperature paint adds about 55 days a year here.

Towns near Rockwall compared

Every one of the 6 closest places lands within three days of Rockwall's 90 a year, so the season here is the regional season. Fate, Heath, Rowlett, Royse City, Sachse, Wylie are read from the same station as Rockwall, so their numbers match; the real difference is the distance from that station.

PlaceFrom RockwallPainting days a yearWindowStation
Fate, TX4 mi northeast90April to Maysame station
Heath, TX5 mi south90April to Maysame station
Rowlett, TX6 mi west90April to Maysame station
Royse City, TX8 mi northeast90April to Maysame station
Sachse, TX9 mi northwest90April to Maysame station
Wylie, TX9 mi northwest90April to Maysame station

How Rockwall ranks in TX

Of 252 TX places with 10,000 people or more, Rockwall (population 53,547, 71st largest) ranks 118th for painting days, 2 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 238 miles south. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 55 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Ralph M Hall Rockwall Municip (0.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.