PaintDays

When to paint a house exterior in Talladega, AL

When to paint in Talladega, AL

A normal season: plan the job, do not leave it late. The painting window is September to October, with 3 good months a year. The best month is May, at about 17 painting days. Book a painter by July.

If you want the house done in September to October, call for quotes in July or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Aug, Sep, Oct, Nov.

  1. 1Jan
  2. 2Feb
  3. 5Mar
  4. 9Apr
  5. 17May
  6. 11Jun
  7. 5Jul
  8. 7Aug
  9. 13Sep
  10. 14Oct
  11. 5Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11536° / 57°F
February21641° / 63°F
March541347° / 70°F
April981851° / 76°F
May17131960° / 83°F
June11101168° / 88°F
July52571° / 91°F
August75770° / 90°F
September13131465° / 87°F
October14142254° / 78°F
November551544° / 67°F
December22940° / 60°F

Deck stain does best in October. Low-temperature paint adds about 53 days a year here.

Towns near Talladega compared

2 of the 6 nearest places get more painting days, the most in Moody (99 a year, 26 miles northwest); 1 gets fewer, down to 69 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Pell City, Oxford, Anniston are read from the same station as Talladega, so their numbers match; the real difference is the distance from that station.

PlaceFrom TalladegaPainting days a yearWindowStation
Pell City, AL13 mi northwest92September to Octobersame station
Oxford, AL18 mi northeast92September to Octobersame station
Sylacauga, AL20 mi southwest69MayMerkel Field Sylacauga Municipal
Anniston, AL24 mi northeast92September to Octobersame station
Moody, AL26 mi northwest99September to OctoberBirmingham International Airport
Leeds, AL28 mi west99September to OctoberBirmingham International Airport

How Talladega ranks in AL

Of 66 AL places with 10,000 people or more, Talladega (population 14,693, 49th largest) ranks 32nd for painting days, right at the state median of 92. The longest season in the state is Albertville, 149 days, 58 miles north. The shortest is Fort Payne at 56. Switching to low-temperature paint here is worth 53 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Anniston Metropolitan Airport (17.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.