PaintDays

When to paint a house exterior in Leeds, AL

When to paint in Leeds, AL

A normal season: plan the job, do not leave it late. The painting window is September to October, with 3 good months a year. The best month is May, at about 17 painting days. Book a painter by July.

If you want the house done in September to October, call for quotes in July or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Aug, Sep, Oct, Nov.

  1. 2Jan
  2. 4Feb
  3. 7Mar
  4. 10Apr
  5. 17May
  6. 9Jun
  7. 5Jul
  8. 6Aug
  9. 13Sep
  10. 17Oct
  11. 6Nov
  12. 3Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January21737° / 57°F
February42942° / 63°F
March771548° / 70°F
April1081853° / 76°F
May17131963° / 84°F
June97970° / 89°F
July52573° / 92°F
August64672° / 91°F
September13131367° / 87°F
October17172357° / 79°F
November661746° / 67°F
December32942° / 60°F

Deck stain does best in October. Low-temperature paint adds about 50 days a year here.

Towns near Leeds compared

Every one of the 6 closest places lands within three days of Leeds's 99 a year, so the season here is the regional season. Irondale, Moody, Trussville, Center Point, Mountain Brook, Clay are read from the same station as Leeds, so their numbers match; the real difference is the distance from that station.

PlaceFrom LeedsPainting days a yearWindowStation
Irondale, AL5 mi west99September to Octobersame station
Moody, AL6 mi northeast99September to Octobersame station
Trussville, AL8 mi north99September to Octobersame station
Center Point, AL9 mi northwest99September to Octobersame station
Mountain Brook, AL10 mi west99September to Octobersame station
Clay, AL11 mi north99September to Octobersame station

How Leeds ranks in AL

Of 66 AL places with 10,000 people or more, Leeds (population 12,573, 57th largest) ranks 19th for painting days, 7 days above the state median of 92. The longest season in the state is Albertville, 149 days, 54 miles northeast. The shortest is Fort Payne at 56. Switching to low-temperature paint here is worth 50 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Birmingham International Airport (10.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.