PaintDays

When to paint a house exterior in Mountain Brook, AL

When to paint in Mountain Brook, AL

A normal season: plan the job, do not leave it late. The painting window is September to October, with 3 good months a year. The best month is May, at about 17 painting days. Book a painter by July.

If you want the house done in September to October, call for quotes in July or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Aug, Sep, Oct, Nov.

  1. 2Jan
  2. 4Feb
  3. 7Mar
  4. 10Apr
  5. 17May
  6. 9Jun
  7. 5Jul
  8. 6Aug
  9. 13Sep
  10. 17Oct
  11. 6Nov
  12. 3Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January21737° / 57°F
February42942° / 63°F
March771548° / 70°F
April1081853° / 76°F
May17131963° / 84°F
June97970° / 89°F
July52573° / 92°F
August64672° / 91°F
September13131367° / 87°F
October17172357° / 79°F
November661746° / 67°F
December32942° / 60°F

Deck stain does best in October. Low-temperature paint adds about 50 days a year here.

Towns near Mountain Brook compared

1 gets fewer, down to 90 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Vestavia Hills, Birmingham, Homewood, Irondale, Leeds are read from the same station as Mountain Brook, so their numbers match; the real difference is the distance from that station.

PlaceFrom Mountain BrookPainting days a yearWindowStation
Vestavia Hills, AL2 mi south99September to Octobersame station
Birmingham, AL4 mi northwest99September to Octobersame station
Homewood, AL5 mi southwest99September to Octobersame station
Irondale, AL5 mi northeast99September to Octobersame station
Hoover, AL9 mi southwest90September to OctoberBessemer Aiport
Leeds, AL10 mi east99September to Octobersame station

How Mountain Brook ranks in AL

Of 66 AL places with 10,000 people or more, Mountain Brook (population 21,701, 31st largest) ranks 14th for painting days, 7 days above the state median of 92. The longest season in the state is Albertville, 149 days, 61 miles northeast. The shortest is Fort Payne at 56. Switching to low-temperature paint here is worth 50 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Birmingham International Airport (5.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.