PaintDays

When to paint a house exterior in Riverton, UT

When to paint in Riverton, UT

A normal season: plan the job, do not leave it late. The painting window is May to June, with 4 good months a year. The best month is September, at about 20 painting days. Book a painter by March.

If you want the house done in May to June, call for quotes in March or earlier; a job pushed past June is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. 1Mar
  4. 4Apr
  5. 13May
  6. 16Jun
  7. 4Jul
  8. 13Aug
  9. 20Sep
  10. 7Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1126° / 39°F
Februaryunder 1under 1326° / 43°F
March111234° / 53°F
April442040° / 62°F
May13132949° / 72°F
June16162059° / 85°F
July44468° / 95°F
August13131365° / 90°F
September20202656° / 83°F
October772344° / 66°F
November1under 1932° / 49°F
Decemberunder 1under 1325° / 40°F

Deck stain does best in September. Low-temperature paint adds about 87 days a year here.

Towns near Riverton compared

Every one of the 6 closest places lands within three days of Riverton's 78 a year, so the season here is the regional season. South Jordan, Bluffdale, Herriman, Draper, West Jordan, Sandy are read from the same station as Riverton, so their numbers match; the real difference is the distance from that station.

PlaceFrom RivertonPainting days a yearWindowStation
South Jordan, UT3 mi northwest78May to Junesame station
Bluffdale, UT3 mi south78May to Junesame station
Herriman, UT3 mi southwest78May to Junesame station
Draper, UT5 mi east78May to Junesame station
West Jordan, UT6 mi north78May to Junesame station
Sandy, UT7 mi northeast78May to Junesame station

How Riverton ranks in UT

Of 67 UT places with 10,000 people or more, Riverton (population 46,680, 21st largest) ranks 10th for painting days, 31 days above the state median of 47. The longest season in the state is West Valley City, 78 days, 12 miles north. The shortest is Hyrum at 11. Switching to low-temperature paint here is worth 87 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Salt Lake City Municipal 2 Airport (7.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.