PaintDays

When to paint a house exterior in Draper, UT

When to paint in Draper, UT

A normal season: plan the job, do not leave it late. The painting window is May to June, with 4 good months a year. The best month is September, at about 20 painting days. Book a painter by March.

If you want the house done in May to June, call for quotes in March or earlier; a job pushed past June is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. 1Mar
  4. 4Apr
  5. 13May
  6. 16Jun
  7. 4Jul
  8. 13Aug
  9. 20Sep
  10. 7Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1126° / 39°F
Februaryunder 1under 1326° / 43°F
March111234° / 53°F
April442040° / 62°F
May13132949° / 72°F
June16162059° / 85°F
July44468° / 95°F
August13131365° / 90°F
September20202656° / 83°F
October772344° / 66°F
November1under 1932° / 49°F
Decemberunder 1under 1325° / 40°F

Deck stain does best in September. Low-temperature paint adds about 87 days a year here.

Towns near Draper compared

1 gets fewer, down to 39 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Bluffdale, Sandy, Riverton, Alpine, Lehi are read from the same station as Draper, so their numbers match; the real difference is the distance from that station.

PlaceFrom DraperPainting days a yearWindowStation
Bluffdale, UT4 mi west78May to Junesame station
Sandy, UT5 mi north78May to Junesame station
Riverton, UT5 mi west78May to Junesame station
Alpine, UT5 mi southeast78May to Junesame station
Lehi, UT6 mi south78May to Junesame station
Highland, UT6 mi southeast39August to SeptemberProvo Municipal Airport

How Draper ranks in UT

Of 67 UT places with 10,000 people or more, Draper (population 50,166, 19th largest) ranks 9th for painting days, 31 days above the state median of 47. The longest season in the state is West Valley City, 78 days, 15 miles northwest. The shortest is Hyrum at 11. Switching to low-temperature paint here is worth 87 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Salt Lake City Municipal 2 Airport (10.8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.