PaintDays

When to paint a house exterior in Port Neches, TX

When to paint in Port Neches, TX

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is May, at about 15 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Oct, Nov.

  1. 2Jan
  2. 4Feb
  3. 9Mar
  4. 13Apr
  5. 15May
  6. 3Jun
  7. 1Jul
  8. under 1Aug
  9. 4Sep
  10. 14Oct
  11. 8Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221243° / 67°F
February421247° / 71°F
March961654° / 77°F
April13101759° / 81°F
May15101567° / 87°F
June32373° / 92°F
July1under 1175° / 94°F
Augustunder 1under 1under 175° / 95°F
September43471° / 91°F
October14121661° / 85°F
November871652° / 76°F
December221248° / 71°F

Deck stain does best in October. Low-temperature paint adds about 49 days a year here.

Towns near Port Neches compared

1 of the 6 nearest places get more painting days, the most in Orange (89 a year, 17 miles northeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Nederland, Groves, Port Arthur, Beaumont, Lumberton are read from the same station as Port Neches, so their numbers match; the real difference is the distance from that station.

PlaceFrom Port NechesPainting days a yearWindowStation
Nederland, TX2 mi west75April to Maysame station
Groves, TX3 mi east75April to Maysame station
Port Arthur, TX6 mi southeast75April to Maysame station
Beaumont, TX14 mi northwest75April to Maysame station
Orange, TX17 mi northeast89April to MayOrange County Airport
Lumberton, TX25 mi northwest75April to Maysame station

How Port Neches ranks in TX

Of 252 TX places with 10,000 people or more, Port Neches (population 13,709, 203rd largest) ranks 207th for painting days, 14 days below the state median of 89. The longest season in the state is Pasadena, 177 days, 74 miles west. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 49 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Southeast Texas Regional Airport (3.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.