PaintDays

When to paint a house exterior in Orange, TX

When to paint in Orange, TX

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is October, at about 18 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Sep, Oct, Nov.

  1. 2Jan
  2. 4Feb
  3. 10Mar
  4. 14Apr
  5. 15May
  6. 3Jun
  7. 1Jul
  8. 1Aug
  9. 8Sep
  10. 18Oct
  11. 9Nov
  12. 4Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221144° / 65°F
February441249° / 69°F
March10101656° / 75°F
April14121761° / 79°F
May15101569° / 86°F
June31375° / 91°F
July1under 1176° / 92°F
August1under 1176° / 93°F
September86872° / 90°F
October18182161° / 83°F
November991654° / 74°F
December441349° / 68°F

Deck stain does best in October. Low-temperature paint adds about 46 days a year here.

Towns near Orange compared

6 get fewer, down to 75 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom OrangePainting days a yearWindowStation
Groves, TX16 mi southwest75April to MaySoutheast Texas Regional Airport
Port Neches, TX17 mi southwest75April to MaySoutheast Texas Regional Airport
Port Arthur, TX18 mi southwest75April to MaySoutheast Texas Regional Airport
Nederland, TX18 mi southwest75April to MaySoutheast Texas Regional Airport
Beaumont, TX24 mi west75April to MaySoutheast Texas Regional Airport
Sulphur, LA25 mi east86April to MaySouthland Field Airport

How Orange ranks in TX

Of 252 TX places with 10,000 people or more, Orange (population 19,275, 161st largest) ranks 127th for painting days, right at the state median of 89. The longest season in the state is Pasadena, 177 days, 90 miles west. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 46 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Orange County Airport (4.8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.