PaintDays

When to paint a house exterior in Peabody, MA

When to paint in Peabody, MA

A normal season: plan the job, do not leave it late. The painting window is June to August, with 3 good months a year. The best month is August, at about 15 painting days. Book a painter by April.

If you want the house done in June to August, call for quotes in April or earlier; a job pushed past August is likely to wait until next year. For a deck, the months with enough staining days to spare are Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 5May
  6. 13Jun
  7. 12Jul
  8. 15Aug
  9. 10Sep
  10. 3Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1121° / 40°F
Februaryunder 1under 1121° / 43°F
Marchunder 1under 1227° / 49°F
April1under 1837° / 59°F
May531646° / 70°F
June1381655° / 78°F
July1261362° / 85°F
August15111661° / 84°F
September1081654° / 77°F
October331243° / 66°F
November11633° / 55°F
Decemberunder 1under 1126° / 45°F

Deck stain does best in August. Low-temperature paint adds about 48 days a year here.

Towns near Peabody compared

3 of the 6 nearest places get more painting days, the most in Melrose (74 a year, 7 miles southwest). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Lynn, Salem, Beverly are read from the same station as Peabody, so their numbers match; the real difference is the distance from that station.

PlaceFrom PeabodyPainting days a yearWindowStation
Lynn, MA4 mi south60June to Augustsame station
Salem, MA4 mi southeast60June to Augustsame station
Beverly, MA7 mi east60June to Augustsame station
Melrose, MA7 mi southwest74August to SeptemberGen E L Logan International A
Revere, MA8 mi south74August to SeptemberGen E L Logan International A
Malden, MA9 mi southwest74August to SeptemberGen E L Logan International A

How Peabody ranks in MA

Of 58 MA places with 10,000 people or more, Peabody (population 55,418, 22nd largest) ranks 27th for painting days, right at the state median of 60. The longest season in the state is Boston, 74 days, 14 miles south. The shortest is Greenfield at 41. Switching to low-temperature paint here is worth 48 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Beverly Municipal Airport (4.3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.