PaintDays

When to paint a house exterior in Lynn, MA

When to paint in Lynn, MA

A normal season: plan the job, do not leave it late. The painting window is June to August, with 3 good months a year. The best month is August, at about 15 painting days. Book a painter by April.

If you want the house done in June to August, call for quotes in April or earlier; a job pushed past August is likely to wait until next year. For a deck, the months with enough staining days to spare are Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 5May
  6. 13Jun
  7. 12Jul
  8. 15Aug
  9. 10Sep
  10. 3Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1121° / 40°F
Februaryunder 1under 1121° / 43°F
Marchunder 1under 1227° / 49°F
April1under 1837° / 59°F
May531646° / 70°F
June1381655° / 78°F
July1261362° / 85°F
August15111661° / 84°F
September1081654° / 77°F
October331243° / 66°F
November11633° / 55°F
Decemberunder 1under 1126° / 45°F

Deck stain does best in August. Low-temperature paint adds about 48 days a year here.

Towns near Lynn compared

4 of the 6 nearest places get more painting days, the most in Revere (74 a year, 4 miles south). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Salem, Peabody are read from the same station as Lynn, so their numbers match; the real difference is the distance from that station.

PlaceFrom LynnPainting days a yearWindowStation
Salem, MA4 mi northeast60June to Augustsame station
Revere, MA4 mi south74August to SeptemberGen E L Logan International A
Peabody, MA4 mi north60June to Augustsame station
Melrose, MA5 mi west74August to SeptemberGen E L Logan International A
Malden, MA6 mi southwest74August to SeptemberGen E L Logan International A
Chelsea, MA6 mi southwest74August to SeptemberGen E L Logan International A

How Lynn ranks in MA

Of 58 MA places with 10,000 people or more, Lynn (population 103,489, 7th largest) ranks 26th for painting days, right at the state median of 60. The longest season in the state is Boston, 74 days, 10 miles south. The shortest is Greenfield at 41. Switching to low-temperature paint here is worth 48 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Beverly Municipal Airport (7.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.