PaintDays

When to paint a house exterior in Paris, TN

When to paint in Paris, TN

A normal season: plan the job, do not leave it late. The painting window is May to September, with 5 good months a year. The best month is May, at about 21 painting days. Book a painter by March.

If you want the house done in May to September, call for quotes in March or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Jul, Aug, Sep, Oct.

  1. 1Jan
  2. 2Feb
  3. 5Mar
  4. 11Apr
  5. 21May
  6. 20Jun
  7. 14Jul
  8. 16Aug
  9. 19Sep
  10. 12Oct
  11. 4Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11531° / 47°F
February22833° / 52°F
March551841° / 62°F
April11112348° / 70°F
May21202559° / 79°F
June20192066° / 86°F
July14121470° / 88°F
August16151767° / 86°F
September19192261° / 83°F
October12112350° / 73°F
November441439° / 59°F
December22835° / 53°F

Deck stain does best in May. Low-temperature paint adds about 68 days a year here.

Towns near Paris compared

1 of the 6 nearest places get more painting days, the most in Dickson (134 a year, 55 miles east); 5 get fewer, down to 79 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom ParisPainting days a yearWindowStation
Murray, KY22 mi north116August to OctoberKyle Oakley Field Airport
Martin, TN30 mi west112May to JuneEverett-Stewart Airport
Union City, TN42 mi west112May to JuneEverett-Stewart Airport
Jackson, TN53 mi southwest79MayMckellar-Sipes Rgnl Airport
Dickson, TN55 mi east134April to OctoberJohn C Tune
Clarksville, TN57 mi east90May to JuneOutlaw Field Airport

How Paris ranks in TN

Of 65 TN places with 10,000 people or more, Paris (population 10,517, 63rd largest) ranks 17th for painting days, 38 days above the state median of 90. The longest season in the state is Winchester, 154 days, 145 miles southeast. The shortest is Elizabethton at 65. Switching to low-temperature paint here is worth 68 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Henry County (5.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.