PaintDays

When to paint a house exterior in Clarksville, TN

When to paint in Clarksville, TN

A normal season: plan the job, do not leave it late. The painting window is May to June, with 4 good months a year. The best month is June, at about 14 painting days. Book a painter by March.

If you want the house done in May to June, call for quotes in March or earlier; a job pushed past June is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Jul, Aug, Sep, Oct.

  1. 1Jan
  2. 2Feb
  3. 3Mar
  4. 7Apr
  5. 13May
  6. 14Jun
  7. 9Jul
  8. 13Aug
  9. 13Sep
  10. 11Oct
  11. 3Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January1under 1431° / 48°F
February22634° / 54°F
March331141° / 63°F
April751448° / 72°F
May1391758° / 80°F
June14111466° / 87°F
July94970° / 90°F
August1391368° / 88°F
September13121561° / 84°F
October11102150° / 74°F
November331040° / 62°F
December11635° / 54°F

Deck stain does best in September. Low-temperature paint adds about 50 days a year here.

Towns near Clarksville compared

5 of the 6 nearest places get more painting days, the most in Springfield (134 a year, 27 miles east); 1 gets fewer, down to 83 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom ClarksvillePainting days a yearWindowStation
Hopkinsville, KY20 mi north83JuneCampbell Army Airfield Airport
Springfield, TN27 mi east134April to OctoberJohn C Tune
Dickson, TN35 mi south134April to OctoberJohn C Tune
White House, TN38 mi east134April to OctoberJohn C Tune
Goodlettsville, TN39 mi southeast134April to OctoberJohn C Tune
Nashville-Davidson, TN41 mi southeast134April to OctoberJohn C Tune

How Clarksville ranks in TN

Of 65 TN places with 10,000 people or more, Clarksville (population 185,690, 5th largest) ranks 33rd for painting days, right at the state median of 90. The longest season in the state is Winchester, 154 days, 118 miles southeast. The shortest is Elizabethton at 65. Switching to low-temperature paint here is worth 50 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Outlaw Field Airport (5.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.