PaintDays

When to paint a house exterior in Ozark, AL

When to paint in Ozark, AL

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is October, at about 17 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Jun, Sep, Oct, Nov.

  1. 1Jan
  2. 5Feb
  3. 9Mar
  4. 13Apr
  5. 15May
  6. 6Jun
  7. 2Jul
  8. 2Aug
  9. 9Sep
  10. 17Oct
  11. 7Nov
  12. 3Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11740° / 62°F
February551046° / 68°F
March991851° / 74°F
April13112055° / 79°F
May15121662° / 86°F
June65670° / 90°F
July21272° / 91°F
August21272° / 92°F
September99968° / 88°F
October17172258° / 82°F
November771849° / 72°F
December31845° / 65°F

Deck stain does best in October. Low-temperature paint adds about 51 days a year here.

Towns near Ozark compared

1 of the 6 nearest places get more painting days, the most in Enterprise (96 a year, 15 miles southwest); 1 gets fewer, down to 79 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom OzarkPainting days a yearWindowStation
Enterprise, AL15 mi southwest96April to MayShell Ahp
Dothan, AL21 mi southeast85April to MayDothan Regional Airport
Troy, AL31 mi northwest85April to MayTroy Municipal Airport
Eufaula, AL43 mi northeast79MayWeedon Field Airport
Pike Road, AL63 mi northwest85April to MayMaxwell Air Force Base Airport
Montgomery, AL72 mi northwest85April to MayMaxwell Air Force Base Airport

How Ozark ranks in AL

Of 66 AL places with 10,000 people or more, Ozark (population 14,368, 53rd largest) ranks 39th for painting days, 4 days below the state median of 92. The longest season in the state is Albertville, 149 days, 197 miles north. The shortest is Fort Payne at 56. Switching to low-temperature paint here is worth 51 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Hanchey Army Heliport (Fort R (7.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.