PaintDays

When to paint a house exterior in Enterprise, AL

When to paint in Enterprise, AL

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is October, at about 18 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Jun, Sep, Oct, Nov.

  1. 1Jan
  2. 4Feb
  3. 10Mar
  4. 14Apr
  5. 15May
  6. 7Jun
  7. 2Jul
  8. 4Aug
  9. 12Sep
  10. 18Oct
  11. 7Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11840° / 61°F
February441146° / 67°F
March10101852° / 74°F
April14112056° / 78°F
May15121763° / 85°F
June76771° / 90°F
July2under 1273° / 91°F
August42472° / 91°F
September12111269° / 87°F
October18182359° / 80°F
November771750° / 70°F
December221145° / 64°F

Deck stain does best in October. Low-temperature paint adds about 53 days a year here.

Towns near Enterprise compared

1 of the 6 nearest places get more painting days, the most in Niceville (105 a year, 67 miles southwest); 5 get fewer, down to 69 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom EnterprisePainting days a yearWindowStation
Ozark, AL15 mi northeast88April to MayHanchey Army Heliport (Fort R
Dothan, AL27 mi east85April to MayDothan Regional Airport
Troy, AL34 mi north85April to MayTroy Municipal Airport
Eufaula, AL57 mi northeast79MayWeedon Field Airport
Crestview, FL59 mi southwest69MayBob Sikes Airport
Niceville, FL67 mi southwest105April to MayEglin Air Force Base Airport

How Enterprise ranks in AL

Of 66 AL places with 10,000 people or more, Enterprise (population 30,731, 21st largest) ranks 25th for painting days, 4 days above the state median of 92. The longest season in the state is Albertville, 149 days, 204 miles north. The shortest is Fort Payne at 56. Switching to low-temperature paint here is worth 53 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Shell Ahp (2.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.