PaintDays

When to paint a house exterior in Marlborough, MA

When to paint in Marlborough, MA

A short season: book early and expect weather delays. The painting window is August, with 1 good month a year. The best month is August, at about 13 painting days. Book a painter by June.

If you want the house done in August, call for quotes in June or earlier; a job pushed past August is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 5May
  6. 10Jun
  7. 11Jul
  8. 13Aug
  9. 8Sep
  10. 2Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 120° / 41°F
Februaryunder 1under 1119° / 43°F
Marchunder 1under 1226° / 50°F
April1under 1836° / 62°F
May541746° / 74°F
June1061654° / 81°F
July1161162° / 87°F
August1371560° / 86°F
September851753° / 79°F
October221142° / 67°F
November11431° / 55°F
Decemberunder 1under 1124° / 45°F

Deck stain does best in August. Low-temperature paint adds about 51 days a year here.

Towns near Marlborough compared

2 of the 6 nearest places get more painting days, the most in Watertown (74 a year, 19 miles east); 1 gets fewer, down to 46 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Framingham, Waltham are read from the same station as Marlborough, so their numbers match; the real difference is the distance from that station.

PlaceFrom MarlboroughPainting days a yearWindowStation
Framingham, MA6 mi southeast52Augustsame station
Worcester, MA14 mi west72June to SeptemberWorcester Regional Airport
Waltham, MA16 mi east52Augustsame station
Leominster, MA16 mi northwest54AugustFitchburg Municipal Arp
Newton, MA17 mi east46June to SeptemberNorwood Memorial Airport
Watertown, MA19 mi east74August to SeptemberGen E L Logan International A

How Marlborough ranks in MA

Of 58 MA places with 10,000 people or more, Marlborough (population 42,169, 33rd largest) ranks 39th for painting days, 7 days below the state median of 60. The longest season in the state is Boston, 74 days, 27 miles east. The shortest is Greenfield at 41. Switching to low-temperature paint here is worth 51 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Laurence G Hanscom Field Airport (15.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.