PaintDays

When to paint a house exterior in Leominster, MA

When to paint in Leominster, MA

A short season: book early and expect weather delays. The painting window is August, with 1 good month a year. The best month is August, at about 14 painting days. Book a painter by June.

If you want the house done in August, call for quotes in June or earlier; a job pushed past August is likely to wait until next year. For a deck, the months with enough staining days to spare are Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 5May
  6. 11Jun
  7. 11Jul
  8. 14Aug
  9. 10Sep
  10. 2Oct
  11. under 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 119° / 39°F
Februaryunder 1under 1119° / 42°F
Marchunder 1under 1226° / 50°F
April1under 1736° / 62°F
May531647° / 74°F
June1171655° / 82°F
July1151163° / 87°F
August1491561° / 85°F
September1071853° / 78°F
October221242° / 67°F
Novemberunder 1under 1430° / 55°F
Decemberunder 1under 1124° / 45°F

Deck stain does best in August. Low-temperature paint adds about 48 days a year here.

Towns near Leominster compared

1 of the 6 nearest places get more painting days, the most in Worcester (72 a year, 17 miles south). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Fitchburg, Gardner are read from the same station as Leominster, so their numbers match; the real difference is the distance from that station.

PlaceFrom LeominsterPainting days a yearWindowStation
Fitchburg, MA6 mi north54Augustsame station
Gardner, MA12 mi west54Augustsame station
Marlborough, MA16 mi southeast52AugustLaurence G Hanscom Field Airport
Worcester, MA17 mi south72June to SeptemberWorcester Regional Airport
Nashua, NH21 mi northeast56JuneBoire Field Airport
Framingham, MA23 mi southeast52AugustLaurence G Hanscom Field Airport

How Leominster ranks in MA

Of 58 MA places with 10,000 people or more, Leominster (population 44,209, 29th largest) ranks 33rd for painting days, 6 days below the state median of 60. The longest season in the state is Boston, 74 days, 40 miles east. The shortest is Greenfield at 41. Switching to low-temperature paint here is worth 48 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Fitchburg Municipal Arp (2.3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.