PaintDays

When to paint a house exterior in Lebanon, MO

When to paint in Lebanon, MO

A normal season: plan the job, do not leave it late. The painting window is August to September, with 3 good months a year. The best month is September, at about 15 painting days. Book a painter by June.

If you want the house done in August to September, call for quotes in June or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. 1Feb
  3. 2Mar
  4. 6Apr
  5. 9May
  6. 12Jun
  7. 9Jul
  8. 14Aug
  9. 15Sep
  10. 7Oct
  11. 2Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1326° / 45°F
February11628° / 50°F
March211138° / 60°F
April641346° / 70°F
May961456° / 77°F
June12101364° / 86°F
July96968° / 89°F
August14131466° / 86°F
September15111960° / 83°F
October761848° / 71°F
November221137° / 59°F
December11631° / 51°F

Deck stain does best in August. Low-temperature paint adds about 57 days a year here.

Towns near Lebanon compared

1 of the 6 nearest places get more painting days, the most in Rolla (90 a year, 53 miles east); 5 get fewer, down to 72 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom LebanonPainting days a yearWindowStation
Bolivar, MO42 mi west72JuneSpringfield-Branson Regional
Springfield, MO48 mi southwest72JuneSpringfield-Branson Regional
Rolla, MO53 mi east90August to SeptemberRolla National Airport
Ozark, MO54 mi southwest72JuneSpringfield-Branson Regional
Republic, MO54 mi southwest72JuneSpringfield-Branson Regional
Nixa, MO56 mi southwest72JuneSpringfield-Branson Regional

How Lebanon ranks in MO

Of 80 MO places with 10,000 people or more, Lebanon (population 15,538, 52nd largest) ranks 32nd for painting days, 7 days above the state median of 72. The longest season in the state is Branson, 93 days, 81 miles southwest. The shortest is Moberly at 61. Switching to low-temperature paint here is worth 57 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Waynesville Regional Airport (28.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.