PaintDays

When to paint a house exterior in Bolivar, MO

When to paint in Bolivar, MO

A short season: book early and expect weather delays. The painting window is June, with 2 good months a year. The best month is September, at about 15 painting days. Book a painter by April.

If you want the house done in June, call for quotes in April or earlier; a job pushed past June is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. 1Feb
  3. 1Mar
  4. 5Apr
  5. 10May
  6. 13Jun
  7. 7Jul
  8. 11Aug
  9. 15Sep
  10. 8Oct
  11. 2Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1124° / 47°F
February1under 1427° / 53°F
March11936° / 63°F
April541444° / 71°F
May1071555° / 78°F
June13101364° / 88°F
July75769° / 91°F
August1191167° / 89°F
September15141861° / 86°F
October871947° / 74°F
November22935° / 61°F
Decemberunder 1under 1530° / 53°F

Deck stain does best in September. Low-temperature paint adds about 53 days a year here.

Towns near Bolivar compared

2 of the 6 nearest places get more painting days, the most in Monett (83 a year, 55 miles southwest). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Springfield, Republic, Nixa, Ozark are read from the same station as Bolivar, so their numbers match; the real difference is the distance from that station.

PlaceFrom BolivarPainting days a yearWindowStation
Springfield, MO29 mi south72Junesame station
Republic, MO30 mi south72Junesame station
Nixa, MO39 mi south72Junesame station
Ozark, MO41 mi south72Junesame station
Lebanon, MO42 mi east79August to SeptemberWaynesville Regional Airport
Monett, MO55 mi southwest83SeptemberJoplin Regional Airport

How Bolivar ranks in MO

Of 80 MO places with 10,000 people or more, Bolivar (population 11,549, 70th largest) ranks 46th for painting days, right at the state median of 72. The longest season in the state is Branson, 93 days, 69 miles south. The shortest is Moberly at 61. Switching to low-temperature paint here is worth 53 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Springfield-Branson Regional (25.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.