PaintDays

When to paint a house exterior in Hinesville, GA

When to paint in Hinesville, GA

A short season: book early and expect weather delays. The painting window is May, with 2 good months a year. The best month is October, at about 15 painting days. Book a painter by March.

If you want the house done in May, call for quotes in March or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Sep, Oct, Nov.

  1. 2Jan
  2. 4Feb
  3. 7Mar
  4. 12Apr
  5. 13May
  6. 5Jun
  7. 2Jul
  8. 2Aug
  9. 10Sep
  10. 15Oct
  11. 5Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January211039° / 66°F
February431343° / 71°F
March751648° / 77°F
April1292153° / 81°F
May1391561° / 87°F
June55569° / 91°F
July21273° / 94°F
August22272° / 92°F
September10101068° / 88°F
October15152158° / 82°F
November551748° / 74°F
December221143° / 68°F

Deck stain does best in October. Low-temperature paint adds about 63 days a year here.

Towns near Hinesville compared

5 of the 6 nearest places get more painting days, the most in Pooler (91 a year, 28 miles northeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Jesup is read from the same station as Hinesville, so its numbers match; the real difference is the distance from that station.

PlaceFrom HinesvillePainting days a yearWindowStation
Richmond Hill, GA18 mi east88April to MayHunter Army Airfield
Jesup, GA23 mi southwest80Maysame station
Savannah, GA28 mi northeast88April to MayHunter Army Airfield
Pooler, GA28 mi northeast91April to MaySavannah/Hilton Head International Air
Garden City, GA31 mi northeast91April to MaySavannah/Hilton Head International Air
Port Wentworth, GA35 mi northeast91April to MaySavannah/Hilton Head International Air

How Hinesville ranks in GA

Of 101 GA places with 10,000 people or more, Hinesville (population 36,583, 33rd largest) ranks 53rd for painting days, 1 day below the state median of 81. The longest season in the state is McDonough, 144 days, 185 miles northwest. The shortest is Cedartown at 56. Switching to low-temperature paint here is worth 63 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Wright Army Airfield Airport (4.8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.