PaintDays

When to paint a house exterior in Pooler, GA

When to paint in Pooler, GA

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is October, at about 17 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Jun, Sep, Oct, Nov.

  1. 2Jan
  2. 6Feb
  3. 9Mar
  4. 15Apr
  5. 14May
  6. 6Jun
  7. 1Jul
  8. 3Aug
  9. 10Sep
  10. 17Oct
  11. 6Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221240° / 66°F
February651544° / 71°F
March991949° / 77°F
April15132155° / 81°F
May14121663° / 87°F
June66670° / 92°F
July11174° / 94°F
August33373° / 93°F
September1091069° / 89°F
October17172259° / 83°F
November661849° / 74°F
December221044° / 69°F

Deck stain does best in October. Low-temperature paint adds about 61 days a year here.

Towns near Pooler compared

Every one of the 6 closest places lands within three days of Pooler's 91 a year, so the season here is the regional season. Garden City, Port Wentworth, Rincon, Hardeeville are read from the same station as Pooler, so their numbers match; the real difference is the distance from that station.

PlaceFrom PoolerPainting days a yearWindowStation
Garden City, GA5 mi east91April to Maysame station
Port Wentworth, GA7 mi northeast91April to Maysame station
Savannah, GA7 mi southeast88April to MayHunter Army Airfield
Rincon, GA13 mi north91April to Maysame station
Richmond Hill, GA15 mi south88April to MayHunter Army Airfield
Hardeeville, SC18 mi northeast91April to Maysame station

How Pooler ranks in GA

Of 101 GA places with 10,000 people or more, Pooler (population 31,171, 42nd largest) ranks 35th for painting days, 10 days above the state median of 81. The longest season in the state is McDonough, 144 days, 192 miles northwest. The shortest is Cedartown at 56. Switching to low-temperature paint here is worth 61 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Savannah/Hilton Head International Air (3.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.