When to paint a house exterior in Gulf Shores, AL

When to paint in Gulf Shores, AL

A normal season: plan the job, do not leave it late. The painting window is April to June, with 5 good months a year. The best month is May, at about 20 painting days. Book a painter by February.

If you want the house done in April to June, call for quotes in February or earlier; a job pushed past June is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Jun, Sep, Oct, Nov.

  1. 2Jan
  2. 4Feb
  3. 9Mar
  4. 14Apr
  5. 20May
  6. 13Jun
  7. 6Jul
  8. 5Aug
  9. 12Sep
  10. 17Oct
  11. 6Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221144° / 63°F
February421150° / 68°F
March981755° / 73°F
April14131959° / 77°F
May20172167° / 83°F
June13111373° / 88°F
July64676° / 90°F
August53575° / 90°F
September12101270° / 87°F
October17162062° / 81°F
November651752° / 72°F
December21950° / 67°F

Deck stain does best in May. Low-temperature paint adds about 50 days a year here.

Towns near Gulf Shores compared

1 of the 6 nearest places get more painting days, the most in Pensacola (117 a year, 33 miles east); 3 get fewer, down to 95 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Foley, Fairhope are read from the same station as Gulf Shores, so their numbers match; the real difference is the distance from that station.

PlaceFrom Gulf ShoresPainting days a yearWindowStation
Foley, AL9 mi north112April to Junesame station
Fairhope, AL20 mi northwest112April to Junesame station
Daphne, AL26 mi northwest95April to MayMobile Downtown Airport
Spanish Fort, AL32 mi north95April to MayMobile Downtown Airport
Pensacola, FL33 mi east117April to MayPensacola Regional Airport
Mobile, AL36 mi northwest95April to MayMobile Downtown Airport

How Gulf Shores ranks in AL

Of 66 AL places with 10,000 people or more, Gulf Shores (population 17,431, 37th largest) ranks 6th for painting days, 21 days above the state median of 92. The longest season in the state is Albertville, 149 days, 289 miles north. The shortest is Fort Payne at 56. Switching to low-temperature paint here is worth 50 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Weeks Bay Reserve (12.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.