PaintDays

When to paint a house exterior in Spanish Fort, AL

When to paint in Spanish Fort, AL

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is October, at about 19 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Mar, Apr, May, Sep, Oct, Nov.

  1. 1Jan
  2. 3Feb
  3. 8Mar
  4. 15Apr
  5. 18May
  6. 7Jun
  7. 1Jul
  8. 2Aug
  9. 9Sep
  10. 19Oct
  11. 9Nov
  12. 2Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January111043° / 63°F
February33949° / 68°F
March861455° / 74°F
April15121760° / 78°F
May18141967° / 85°F
June74774° / 90°F
July1under 1176° / 92°F
August2under 1276° / 92°F
September99972° / 89°F
October19182163° / 83°F
November991753° / 73°F
December221149° / 67°F

Deck stain does best in October. Low-temperature paint adds about 43 days a year here.

Towns near Spanish Fort compared

2 of the 6 nearest places get more painting days, the most in Fairhope (112 a year, 14 miles south); 2 get fewer, down to 78 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Daphne, Mobile are read from the same station as Spanish Fort, so their numbers match; the real difference is the distance from that station.

PlaceFrom Spanish FortPainting days a yearWindowStation
Daphne, AL7 mi south95April to Maysame station
Fairhope, AL14 mi south112April to JuneWeeks Bay Reserve
Mobile, AL15 mi west95April to Maysame station
Prichard, AL16 mi west78MayMobile Regional Airport
Saraland, AL17 mi northwest78MayMobile Regional Airport
Foley, AL25 mi southeast112April to JuneWeeks Bay Reserve

How Spanish Fort ranks in AL

Of 66 AL places with 10,000 people or more, Spanish Fort (population 11,118, 61st largest) ranks 28th for painting days, 3 days above the state median of 92. The longest season in the state is Albertville, 149 days, 263 miles north. The shortest is Fort Payne at 56. Switching to low-temperature paint here is worth 43 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Mobile Downtown Airport (13.8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.