PaintDays

When to paint a house exterior in Greeneville, TN

When to paint in Greeneville, TN

A short season: book early and expect weather delays. The painting window is September, with 1 good month a year. The best month is September, at about 14 painting days. Book a painter by July.

If you want the house done in September, call for quotes in July or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. 1Mar
  4. 3Apr
  5. 9May
  6. 11Jun
  7. 8Jul
  8. 12Aug
  9. 14Sep
  10. 5Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1227° / 50°F
Februaryunder 1under 1231° / 57°F
March11636° / 65°F
April331242° / 73°F
May961553° / 80°F
June1191360° / 86°F
July84865° / 90°F
August1281264° / 88°F
September14101757° / 84°F
October541746° / 74°F
November11534° / 63°F
Decemberunder 1under 1231° / 55°F

Deck stain does best in September. Low-temperature paint adds about 45 days a year here.

Towns near Greeneville compared

2 of the 6 nearest places get more painting days, the most in Morristown (124 a year, 27 miles west). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Johnson City, Kingsport, Elizabethton, Bristol are read from the same station as Greeneville, so their numbers match; the real difference is the distance from that station.

PlaceFrom GreenevillePainting days a yearWindowStation
Morristown, TN27 mi west124April to JuneKnoxville Downtown Island
Johnson City, TN27 mi northeast65Septembersame station
Kingsport, TN29 mi northeast65Septembersame station
Elizabethton, TN35 mi east65Septembersame station
Bristol, TN43 mi northeast65Septembersame station
Asheville, NC44 mi south81August to SeptemberAsheville Regional Airport

How Greeneville ranks in TN

Of 65 TN places with 10,000 people or more, Greeneville (population 15,979, 38th largest) ranks 64th for painting days, 25 days below the state median of 90. The longest season in the state is Winchester, 154 days, 197 miles west. The shortest is Elizabethton at 65. Switching to low-temperature paint here is worth 45 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Tri-Cities Regional Tn/Va Air (31.8 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.