PaintDays

When to paint a house exterior in Asheville, NC

When to paint in Asheville, NC

A normal season: plan the job, do not leave it late. The painting window is August to September, with 3 good months a year. The best month is September, at about 16 painting days. Book a painter by June.

If you want the house done in August to September, call for quotes in June or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. 1Feb
  3. 2Mar
  4. 4Apr
  5. 11May
  6. 15Jun
  7. 12Jul
  8. 14Aug
  9. 16Sep
  10. 7Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1228° / 52°F
February1under 1332° / 58°F
March21838° / 64°F
April421443° / 72°F
May1171753° / 78°F
June15101660° / 84°F
July1261265° / 87°F
August1481464° / 85°F
September16111958° / 81°F
October761947° / 73°F
November11736° / 62°F
Decemberunder 1under 1332° / 56°F

Deck stain does best in September. Low-temperature paint adds about 51 days a year here.

Towns near Asheville compared

3 get fewer, down to 65 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Hendersonville, Waynesville are read from the same station as Asheville, so their numbers match; the real difference is the distance from that station.

PlaceFrom AshevillePainting days a yearWindowStation
Hendersonville, NC18 mi south81August to Septembersame station
Waynesville, NC26 mi west81August to Septembersame station
Greeneville, TN44 mi north65SeptemberTri-Cities Regional Tn/Va Air
Greer, SC48 mi southeast73MayGreenville-Spartanburg International A
Morganton, NC49 mi east73JuneMorganton-Lenoir Airport
Greenville, SC52 mi south82September to OctoberGreenville Downtown Airport

How Asheville ranks in NC

Of 91 NC places with 10,000 people or more, Asheville (population 94,992, 12th largest) ranks 27th for painting days, 4 days above the state median of 77. The longest season in the state is Greenville, 123 days, 291 miles east. The shortest is Boone at 50. Switching to low-temperature paint here is worth 51 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Asheville Regional Airport (9.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.