When to paint a house exterior in Dunwoody, GA

When to paint in Dunwoody, GA

A short season: book early and expect weather delays. The painting window is May, with 2 good months a year. The best month is May, at about 14 painting days. Book a painter by March.

If you want the house done in May, call for quotes in March or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Aug, Sep, Oct.

  1. under 1Jan
  2. 2Feb
  3. 3Mar
  4. 6Apr
  5. 14May
  6. 9Jun
  7. 5Jul
  8. 8Aug
  9. 13Sep
  10. 10Oct
  11. 3Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1432° / 56°F
February21538° / 62°F
March331243° / 69°F
April651848° / 75°F
May14101758° / 83°F
June98966° / 89°F
July53570° / 92°F
August84869° / 90°F
September13111463° / 86°F
October1082151° / 77°F
November331441° / 67°F
Decemberunder 1under 1637° / 59°F

Deck stain does best in September. Low-temperature paint adds about 57 days a year here.

Towns near Dunwoody compared

Every one of the 6 closest places lands within three days of Dunwoody's 74 a year, so the season here is the regional season. Sandy Springs, Doraville, Chamblee, Peachtree Corners, Brookhaven, Norcross are read from the same station as Dunwoody, so their numbers match; the real difference is the distance from that station.

PlaceFrom DunwoodyPainting days a yearWindowStation
Sandy Springs, GA3 mi west74Maysame station
Doraville, GA3 mi southeast74Maysame station
Chamblee, GA4 mi south74Maysame station
Peachtree Corners, GA5 mi east74Maysame station
Brookhaven, GA6 mi south74Maysame station
Norcross, GA6 mi east74Maysame station

How Dunwoody ranks in GA

Of 101 GA places with 10,000 people or more, Dunwoody (population 51,795, 20th largest) ranks 66th for painting days, 7 days below the state median of 81. The longest season in the state is McDonough, 144 days, 36 miles south. The shortest is Cedartown at 56. Switching to low-temperature paint here is worth 57 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Dekalb-Peachtree Airport (4.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.