PaintDays

When to paint a house exterior in Doraville, GA

When to paint in Doraville, GA

A short season: book early and expect weather delays. The painting window is May, with 2 good months a year. The best month is May, at about 14 painting days. Book a painter by March.

If you want the house done in May, call for quotes in March or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Aug, Sep, Oct.

  1. under 1Jan
  2. 2Feb
  3. 3Mar
  4. 6Apr
  5. 14May
  6. 9Jun
  7. 5Jul
  8. 8Aug
  9. 13Sep
  10. 10Oct
  11. 3Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1432° / 56°F
February21538° / 62°F
March331243° / 69°F
April651848° / 75°F
May14101758° / 83°F
June98966° / 89°F
July53570° / 92°F
August84869° / 90°F
September13111463° / 86°F
October1082151° / 77°F
November331441° / 67°F
Decemberunder 1under 1637° / 59°F

Deck stain does best in September. Low-temperature paint adds about 57 days a year here.

Towns near Doraville compared

Every one of the 6 closest places lands within three days of Doraville's 74 a year, so the season here is the regional season. Chamblee, Dunwoody, Norcross, Peachtree Corners, Brookhaven, Tucker are read from the same station as Doraville, so their numbers match; the real difference is the distance from that station.

PlaceFrom DoravillePainting days a yearWindowStation
Chamblee, GA3 mi southwest74Maysame station
Dunwoody, GA3 mi northwest74Maysame station
Norcross, GA4 mi northeast74Maysame station
Peachtree Corners, GA5 mi northeast74Maysame station
Brookhaven, GA5 mi southwest74Maysame station
Tucker, GA6 mi southeast74Maysame station

How Doraville ranks in GA

Of 101 GA places with 10,000 people or more, Doraville (population 12,436, 89th largest) ranks 74th for painting days, 7 days below the state median of 81. The longest season in the state is McDonough, 144 days, 33 miles south. The shortest is Cedartown at 56. Switching to low-temperature paint here is worth 57 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Dekalb-Peachtree Airport (2.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.