PaintDays

When to paint a house exterior in Crowley, TX

When to paint in Crowley, TX

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is May, at about 18 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Sep, Oct, Nov, Dec.

  1. 2Jan
  2. 6Feb
  3. 12Mar
  4. 16Apr
  5. 18May
  6. 4Jun
  7. 2Jul
  8. 2Aug
  9. 8Sep
  10. 15Oct
  11. 8Nov
  12. 5Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221136° / 59°F
February661440° / 63°F
March12122149° / 71°F
April16162554° / 77°F
May18142064° / 85°F
June43472° / 94°F
July22275° / 98°F
August21275° / 98°F
September88868° / 92°F
October15152157° / 82°F
November881946° / 69°F
December551541° / 63°F

Deck stain does best in April. Low-temperature paint adds about 64 days a year here.

Towns near Crowley compared

2 get fewer, down to 84 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Burleson, Forest Hill are read from the same station as Crowley, so their numbers match; the real difference is the distance from that station.

PlaceFrom CrowleyPainting days a yearWindowStation
Burleson, TX5 mi southeast97April to Maysame station
Forest Hill, TX8 mi northeast97April to Maysame station
Benbrook, TX9 mi northwest94April to MayFort Worth Naval Air Station
Kennedale, TX9 mi northeast84April to MayArlington Municipal Airport
White Settlement, TX14 mi northwest94April to MayFort Worth Naval Air Station
Mansfield, TX14 mi east84April to MayArlington Municipal Airport

How Crowley ranks in TX

Of 252 TX places with 10,000 people or more, Crowley (population 20,483, 151st largest) ranks 65th for painting days, 8 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 240 miles southeast. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 64 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Fort Worth Spinks Airport (3.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.