When to paint a house exterior in Burleson, TX

When to paint in Burleson, TX

A normal season: plan the job, do not leave it late. The painting window is April to May, with 3 good months a year. The best month is May, at about 18 painting days. Book a painter by February.

If you want the house done in April to May, call for quotes in February or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Sep, Oct, Nov, Dec.

  1. 2Jan
  2. 6Feb
  3. 12Mar
  4. 16Apr
  5. 18May
  6. 4Jun
  7. 2Jul
  8. 2Aug
  9. 8Sep
  10. 15Oct
  11. 8Nov
  12. 5Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January221136° / 59°F
February661440° / 63°F
March12122149° / 71°F
April16162554° / 77°F
May18142064° / 85°F
June43472° / 94°F
July22275° / 98°F
August21275° / 98°F
September88868° / 92°F
October15152157° / 82°F
November881946° / 69°F
December551541° / 63°F

Deck stain does best in April. Low-temperature paint adds about 64 days a year here.

Towns near Burleson compared

3 get fewer, down to 84 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Crowley, Forest Hill are read from the same station as Burleson, so their numbers match; the real difference is the distance from that station.

PlaceFrom BurlesonPainting days a yearWindowStation
Crowley, TX5 mi northwest97April to Maysame station
Forest Hill, TX11 mi north97April to Maysame station
Kennedale, TX11 mi northeast84April to MayArlington Municipal Airport
Cleburne, TX12 mi southwest90April to MayCleburne Municipal Airport
Mansfield, TX12 mi east84April to MayArlington Municipal Airport
Benbrook, TX14 mi northwest94April to MayFort Worth Naval Air Station

How Burleson ranks in TX

Of 252 TX places with 10,000 people or more, Burleson (population 56,253, 68th largest) ranks 64th for painting days, 8 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 236 miles southeast. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 64 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Fort Worth Spinks Airport (3.6 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.