PaintDays

When to paint a house exterior in Bellmead, TX

When to paint in Bellmead, TX

A normal season: plan the job, do not leave it late. The painting window is March to May, with 5 good months a year. The best month is May, at about 24 painting days. Book a painter by January.

If you want the house done in March to May, call for quotes in January or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Jun, Sep, Oct, Nov, Dec.

  1. 3Jan
  2. 7Feb
  3. 17Mar
  4. 22Apr
  5. 24May
  6. 6Jun
  7. 1Jul
  8. 2Aug
  9. 9Sep
  10. 18Oct
  11. 14Nov
  12. 7Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January331637° / 61°F
February762043° / 66°F
March17172851° / 73°F
April22212957° / 78°F
May24202466° / 86°F
June64673° / 93°F
July11175° / 97°F
August21275° / 98°F
September99969° / 92°F
October18182459° / 84°F
November14142649° / 72°F
December772042° / 65°F

Deck stain does best in April. Low-temperature paint adds about 75 days a year here.

Towns near Bellmead compared

6 get fewer, down to 61 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom BellmeadPainting days a yearWindowStation
Waco, TX7 mi southwest61March to MayWaco Regional Airport
Robinson, TX11 mi south77AprilMc Gregor Executive Airport
Hewitt, TX12 mi southwest77AprilMc Gregor Executive Airport
Temple, TX39 mi southwest77April to MayDraughon-Miller Cntrl Tx Rgnl
Gatesville, TX40 mi west95March to MayGatesville Municipal Airport
Belton, TX44 mi southwest77April to MayDraughon-Miller Cntrl Tx Rgnl

How Bellmead ranks in TX

Of 252 TX places with 10,000 people or more, Bellmead (population 10,607, 239th largest) ranks 27th for painting days, 40 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 177 miles southeast. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 75 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Tstc Waco (2.7 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.