PaintDays

When to paint a house exterior in Aiken, SC

When to paint in Aiken, SC

A normal season: plan the job, do not leave it late. The painting window is September to October, with 3 good months a year. The best month is May, at about 16 painting days. Book a painter by July.

If you want the house done in September to October, call for quotes in July or earlier; a job pushed past October is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Sep, Oct.

  1. 1Jan
  2. 3Feb
  3. 6Mar
  4. 11Apr
  5. 16May
  6. 11Jun
  7. 4Jul
  8. 7Aug
  9. 15Sep
  10. 14Oct
  11. 4Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January11535° / 57°F
February32940° / 64°F
March631645° / 70°F
April11102250° / 76°F
May16102059° / 83°F
June1161167° / 90°F
July41471° / 92°F
August73770° / 90°F
September15121564° / 86°F
October14132453° / 77°F
November441644° / 67°F
December11838° / 59°F

Deck stain does best in October. Low-temperature paint adds about 64 days a year here.

Towns near Aiken compared

4 get fewer, down to 58 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom AikenPainting days a yearWindowStation
North Augusta, SC13 mi west94April to MayDaniel Field Airport
Augusta-Richmond County, GA23 mi southwest58April to MayAugusta Regional At Bush Fiel
Grovetown, GA28 mi west94April to MayDaniel Field Airport
Lexington, SC43 mi northeast71OctoberColumbia Metropolitan Airport
West Columbia, SC48 mi northeast71OctoberColumbia Metropolitan Airport
Cayce, SC49 mi northeast77OctoberColumbia Owens Downtown Airport

How Aiken ranks in SC

Of 42 SC places with 10,000 people or more, Aiken (population 32,694, 17th largest) ranks 14th for painting days, 10 days above the state median of 82. The longest season in the state is Myrtle Beach, 122 days, 164 miles east. The shortest is Tega Cay at 68. Switching to low-temperature paint here is worth 64 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Aiken Municipal Airport (8.5 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.