PaintDays

When to paint a house exterior in Wilsonville, OR

When to paint in Wilsonville, OR

A normal season: plan the job, do not leave it late. The painting window is June to August, with 3 good months a year. The best month is July, at about 19 painting days. Book a painter by April.

If you want the house done in June to August, call for quotes in April or earlier; a job pushed past August is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 7May
  6. 13Jun
  7. 19Jul
  8. 17Aug
  9. 11Sep
  10. 3Oct
  11. under 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1135° / 50°F
Februaryunder 1under 1435° / 52°F
Marchunder 1under 1737° / 58°F
April1under 11341° / 64°F
May741947° / 73°F
June13111952° / 80°F
July19171955° / 87°F
August17161956° / 88°F
September11111951° / 79°F
October331344° / 67°F
Novemberunder 1under 1339° / 55°F
Decemberunder 1under 1135° / 49°F

Deck stain does best in July. Low-temperature paint adds about 67 days a year here.

Towns near Wilsonville compared

1 gets fewer, down to 39 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Tualatin, Sherwood, Canby, West Linn, Lake Oswego are read from the same station as Wilsonville, so their numbers match; the real difference is the distance from that station.

PlaceFrom WilsonvillePainting days a yearWindowStation
Tualatin, OR5 mi north69June to Augustsame station
Sherwood, OR5 mi northwest69June to Augustsame station
Canby, OR5 mi southeast69June to Augustsame station
West Linn, OR7 mi northeast69June to Augustsame station
Tigard, OR8 mi north39AugustPortland-Hillsboro Airport
Lake Oswego, OR8 mi northeast69June to Augustsame station

How Wilsonville ranks in OR

Of 57 OR places with 10,000 people or more, Wilsonville (population 27,895, 22nd largest) ranks 13th for painting days, 17 days above the state median of 52. The longest season in the state is Portland, 87 days, 17 miles north. The shortest is Klamath Falls at 5. Switching to low-temperature paint here is worth 67 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Aurora State Airport (4.3 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.