PaintDays

When to paint a house exterior in West Haven, UT

When to paint in West Haven, UT

A short season: book early and expect weather delays. The painting window is September, with 1 good month a year. The best month is September, at about 13 painting days. Book a painter by July.

If you want the house done in September, call for quotes in July or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Sep, Oct.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 2Apr
  5. 8May
  6. 11Jun
  7. 4Jul
  8. 7Aug
  9. 13Sep
  10. 6Oct
  11. under 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 122° / 40°F
Februaryunder 1under 1225° / 45°F
Marchunder 1under 1832° / 56°F
April221438° / 64°F
May882046° / 74°F
June1181357° / 88°F
July41466° / 96°F
August73763° / 93°F
September13131954° / 84°F
October661942° / 68°F
Novemberunder 1under 1731° / 52°F
Decemberunder 1under 1123° / 41°F

Deck stain does best in September. Low-temperature paint adds about 64 days a year here.

Towns near West Haven compared

2 of the 6 nearest places get more painting days, the most in West Point (56 a year, 6 miles south). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Roy, Ogden, Clinton, South Ogden are read from the same station as West Haven, so their numbers match; the real difference is the distance from that station.

PlaceFrom West HavenPainting days a yearWindowStation
Roy, UT3 mi south50Septembersame station
Ogden, UT5 mi east50Septembersame station
Clinton, UT5 mi south50Septembersame station
South Ogden, UT6 mi southeast50Septembersame station
West Point, UT6 mi south56JuneHill Air Force Base Airport
Clearfield, UT8 mi south56JuneHill Air Force Base Airport

How West Haven ranks in UT

Of 67 UT places with 10,000 people or more, West Haven (population 24,617, 42nd largest) ranks 27th for painting days, 2 days above the state median of 47. The longest season in the state is West Valley City, 78 days, 36 miles south. The shortest is Hyrum at 11. Switching to low-temperature paint here is worth 64 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Ogden-Hinckley Airport (2.4 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.