PaintDays

When to paint a house exterior in Weirton, WV

When to paint in Weirton, WV

A normal season: plan the job, do not leave it late. The painting window is June to September, with 4 good months a year. The best month is August, at about 17 painting days. Book a painter by April.

If you want the house done in June to September, call for quotes in April or earlier; a job pushed past September is likely to wait until next year. For a deck, the months with enough staining days to spare are May, Jun, Jul, Aug, Sep, Oct.

  1. under 1Jan
  2. 1Feb
  3. 1Mar
  4. 3Apr
  5. 8May
  6. 13Jun
  7. 15Jul
  8. 17Aug
  9. 15Sep
  10. 6Oct
  11. 1Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1123° / 41°F
February1under 1326° / 46°F
March1under 1432° / 56°F
April331041° / 66°F
May851452° / 75°F
June1381559° / 82°F
July1591563° / 86°F
August17101762° / 84°F
September15111957° / 80°F
October651646° / 69°F
November11735° / 56°F
December1under 1229° / 47°F

Deck stain does best in September. Low-temperature paint adds about 43 days a year here.

Towns near Weirton compared

2 get fewer, down to 61 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Steubenville, Wheeling are read from the same station as Weirton, so their numbers match; the real difference is the distance from that station.

PlaceFrom WeirtonPainting days a yearWindowStation
Steubenville, OH6 mi southwest79June to Septembersame station
Washington, PA23 mi southeast61July to AugustWashington County Airport
Wheeling, WV24 mi south79June to Septembersame station
Franklin Park, PA28 mi northeast76July to SeptemberPittsburgh International Airport
Bethel Park, PA28 mi east79June to SeptemberAllegheny County Airport
Whitehall, PA30 mi east79June to SeptemberAllegheny County Airport

How Weirton ranks in WV

Of 13 WV places with 10,000 people or more, Weirton (population 18,317, 7th largest) ranks 2nd for painting days, 10 days above the state median of 69. The longest season in the state is Wheeling, 79 days, 24 miles south. The shortest is Martinsburg at 58. Switching to low-temperature paint here is worth 43 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Wheeling Ohio County Airport (16.5 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.