PaintDays

When to paint a house exterior in Weddington, NC

When to paint in Weddington, NC

A short season: book early and expect weather delays. The painting window is May, with 2 good months a year. The best month is September, at about 13 painting days. Book a painter by March.

If you want the house done in May, call for quotes in March or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Apr, May, Jun, Aug, Sep, Oct.

  1. 1Jan
  2. 3Feb
  3. 4Mar
  4. 9Apr
  5. 13May
  6. 12Jun
  7. 4Jul
  8. 8Aug
  9. 13Sep
  10. 10Oct
  11. 3Nov
  12. 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January1under 1432° / 56°F
February32737° / 62°F
March441342° / 68°F
April971948° / 76°F
May1391758° / 82°F
June12101265° / 89°F
July42470° / 92°F
August84868° / 90°F
September13111563° / 86°F
October1082151° / 77°F
November321141° / 67°F
December11636° / 60°F

Deck stain does best in September. Low-temperature paint adds about 56 days a year here.

Towns near Weddington compared

1 gets fewer, down to 75 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Indian Trail, Waxhaw, Matthews, Stallings, Monroe are read from the same station as Weddington, so their numbers match; the real difference is the distance from that station.

PlaceFrom WeddingtonPainting days a yearWindowStation
Indian Trail, NC6 mi northeast79Maysame station
Waxhaw, NC6 mi south79Maysame station
Matthews, NC7 mi north79Maysame station
Stallings, NC7 mi northeast79Maysame station
Monroe, NC10 mi east79Maysame station
Pineville, NC10 mi northwest75MayCharlotte/Douglas Internation

How Weddington ranks in NC

Of 91 NC places with 10,000 people or more, Weddington (population 14,391, 75th largest) ranks 42nd for painting days, 2 days above the state median of 77. The longest season in the state is Greenville, 123 days, 194 miles east. The shortest is Boone at 50. Switching to low-temperature paint here is worth 56 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Monroe Airport (6.5 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.