PaintDays

When to paint a house exterior in Waterloo, IA

When to paint in Waterloo, IA

A short season: book early and expect weather delays. The painting window is July to August, with 2 good months a year. The best month is August, at about 16 painting days. Book a painter by May.

If you want the house done in July to August, call for quotes in May or earlier; a job pushed past August is likely to wait until next year. For a deck, the months with enough staining days to spare are Jun, Jul, Aug, Sep.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. 1Apr
  5. 6May
  6. 9Jun
  7. 16Jul
  8. 16Aug
  9. 10Sep
  10. 3Oct
  11. 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 111° / 31°F
Februaryunder 1under 1under 112° / 35°F
Marchunder 1under 1226° / 50°F
April11936° / 63°F
May641448° / 75°F
June951259° / 86°F
July1681662° / 86°F
August16111859° / 85°F
September1081854° / 81°F
October331340° / 66°F
November11428° / 51°F
Decemberunder 1under 1under 119° / 39°F

Deck stain does best in August. Low-temperature paint adds about 44 days a year here.

Towns near Waterloo compared

3 of the 6 nearest places get more painting days, the most in Marion (70 a year, 50 miles southeast). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule. Cedar Falls, Waverly are read from the same station as Waterloo, so their numbers match; the real difference is the distance from that station.

PlaceFrom WaterlooPainting days a yearWindowStation
Cedar Falls, IA6 mi west62July to Augustsame station
Waverly, IA17 mi north62July to Augustsame station
Marshalltown, IA42 mi southwest70June to SeptemberMarshalltown Municipal Airport
Marion, IA50 mi southeast70June to SeptemberThe Eastern Iowa Airport
Cedar Rapids, IA50 mi southeast70June to SeptemberThe Eastern Iowa Airport
Mason City, IA62 mi northwest59July to AugustMason City Municipal Airport

How Waterloo ranks in IA

Of 41 IA places with 10,000 people or more, Waterloo (population 67,477, 9th largest) ranks 34th for painting days, 10 days below the state median of 72. The longest season in the state is Council Bluffs, 118 days, 200 miles southwest. The shortest is Le Mars at 54. Switching to low-temperature paint here is worth 44 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Waterloo Municipal Airport (4.9 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.