PaintDays

When to paint a house exterior in Victoria, TX

When to paint in Victoria, TX

A short season: book early and expect weather delays. The painting window is April, with 1 good month a year. The best month is April, at about 14 painting days. Book a painter by February.

If you want the house done in April, call for quotes in February or earlier; a job pushed past April is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Oct, Nov.

  1. 3Jan
  2. 6Feb
  3. 11Mar
  4. 14Apr
  5. 11May
  6. 1Jun
  7. under 1Jul
  8. under 1Aug
  9. 3Sep
  10. 9Oct
  11. 8Nov
  12. 4Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January321343° / 70°F
February661447° / 73°F
March11101954° / 79°F
April14131760° / 84°F
May1161168° / 90°F
June11173° / 94°F
Julyunder 1under 1under 175° / 96°F
Augustunder 1under 1under 174° / 98°F
September32371° / 94°F
October981260° / 88°F
November881652° / 78°F
December441447° / 73°F

Deck stain does best in April. Low-temperature paint adds about 51 days a year here.

Towns near Victoria compared

6 of the 6 nearest places get more painting days, the most in Ingleside (146 a year, 68 miles south). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom VictoriaPainting days a yearWindowStation
Port Lavaca, TX26 mi southeast100March to MayCalhoun County Airport
El Campo, TX50 mi northeast92April to MayWharton Regional Airport
Rockport, TX54 mi south131March to MayAransas County Airport
Beeville, TX55 mi southwest94March to AprilBeeville Municipal Airport
Bay City, TX63 mi east88April to MayBay City Municipal Airport
Ingleside, TX68 mi south146April to JulyMustang Beach Airport

How Victoria ranks in TX

Of 252 TX places with 10,000 people or more, Victoria (population 66,020, 61st largest) ranks 227th for painting days, 20 days below the state median of 89. The longest season in the state is Pasadena, 177 days, 124 miles northeast. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 51 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Victoria Regional Airport (4.1 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.