PaintDays

When to paint a house exterior in Tomball, TX

When to paint in Tomball, TX

A normal season: plan the job, do not leave it late. The painting window is March to May, with 4 good months a year. The best month is April, at about 15 painting days. Book a painter by January.

If you want the house done in March to May, call for quotes in January or earlier; a job pushed past May is likely to wait until next year. For a deck, the months with enough staining days to spare are Feb, Mar, Apr, May, Sep, Oct, Nov, Dec.

  1. 3Jan
  2. 7Feb
  3. 14Mar
  4. 15Apr
  5. 13May
  6. 3Jun
  7. 2Jul
  8. 1Aug
  9. 5Sep
  10. 15Oct
  11. 11Nov
  12. 5Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
January331344° / 65°F
February761548° / 70°F
March14112056° / 77°F
April15121860° / 81°F
May1391368° / 87°F
June32374° / 93°F
July21276° / 95°F
August11175° / 96°F
September54571° / 92°F
October15141761° / 85°F
November11101953° / 74°F
December551548° / 69°F

Deck stain does best in October. Low-temperature paint adds about 46 days a year here.

Towns near Tomball compared

4 of the 6 nearest places get more painting days, the most in Houston (167 a year, 25 miles southeast); 2 get fewer, down to 69 a year. A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom TomballPainting days a yearWindowStation
Conroe, TX18 mi northeast69OctoberMontgomery County Airport
Humble, TX22 mi east79March to AprilG Bush Intercontinental Airport/Ho
Katy, TX25 mi southwest100March to MaySugar Land Regional Airport
Houston, TX25 mi southeast167March to MayHouston Dunn Helistop
West University Place, TX29 mi southeast167March to MayHouston Dunn Helistop
Bellaire, TX29 mi south167March to MayHouston Dunn Helistop

How Tomball ranks in TX

Of 252 TX places with 10,000 people or more, Tomball (population 15,152, 194th largest) ranks 92nd for painting days, 5 days above the state median of 89. The longest season in the state is Pasadena, 177 days, 41 miles southeast. The shortest is Town of Pecos at 38. Switching to low-temperature paint here is worth 46 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Hooks Memorial Airpt (4.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.