PaintDays

When to paint a house exterior in Sterling, CO

When to paint in Sterling, CO

Exterior painting here is a gamble in any month. The painting window is not reliable in any month, with 0 good months a year. The best month is August, at about 5 painting days.

If you cannot avoid the thin months, ask the painter for a low-temperature latex and watch the forecast for a dry run of 4 days before you commit. No month here reliably has the dry back-to-back days deck stain needs, so consider a solid stain or a sealer you can apply in shorter breaks.

  1. under 1Jan
  2. under 1Feb
  3. under 1Mar
  4. under 1Apr
  5. 1May
  6. 5Jun
  7. 5Jul
  8. 5Aug
  9. 4Sep
  10. 1Oct
  11. under 1Nov
  12. under 1Dec

Month by month

MonthPainting daysStaining daysWith low-temp paintAvg low / high
Januaryunder 1under 1under 114° / 42°F
Februaryunder 1under 1117° / 51°F
Marchunder 1under 1224° / 59°F
Aprilunder 1under 1531° / 66°F
May1under 11141° / 72°F
June531052° / 87°F
July52557° / 92°F
August53854° / 91°F
September431447° / 86°F
October111134° / 70°F
Novemberunder 1under 1223° / 58°F
Decemberunder 1under 1under 116° / 48°F

Deck stain does best in August. Low-temperature paint adds about 48 days a year here.

Towns near Sterling compared

5 of the 6 nearest places get more painting days, the most in Severance (30 a year, 88 miles west). A gap like that between towns is usually elevation, a coast or a lake, which is why a painter from a few towns over can be on a different schedule.

PlaceFrom SterlingPainting days a yearWindowStation
Fort Morgan, CO40 mi southwest26June to AugustNovember (Grover)
Evans, CO84 mi west24JuneGreeley-Weld County Airport
Greeley, CO84 mi west24JuneGreeley-Weld County Airport
Severance, CO88 mi west30August to SeptemberFort Collins Loveland Airport
Scottsbluff, NE90 mi north19none reliableWestern Ne Regional/Heilig Fi
Windsor, CO91 mi west30August to SeptemberFort Collins Loveland Airport

How Sterling ranks in CO

Of 53 CO places with 10,000 people or more, Sterling (population 13,114, 47th largest) ranks 48th for painting days, 16 days below the state median of 36. The longest season in the state is Cañon City, 71 days, 185 miles southwest. The shortest is Glenwood Springs at 12. Switching to low-temperature paint here is worth 48 extra days, more than most of the summer months on their own.

Where these numbers come from

Daily records from Mike (Haxtun) (16.2 miles away), 2015 to 2024, NOAA Global Summary of the Day. A month is good at 12+ painting days and possible at 6+.